Timeline for action

2020

First use of electric vehicles in place across all our ports. Lighting across the ports is undergoing transition to LED, much of which also incorporate controls and sensors ensuring energy is only used when required.

2021

Peel Ports trialling use of electric power for plant machinery 

2022

Diesel vehicles replaced with 100% electric and biodiesel

2025

Replacement to green electric use scheme which has an emissions factor of half the grid average

2030

67% reduction in fuel consumption

2035

Replacement of all gas usage and transition to electric or lower carbon fuel sources

2040

Net Zero Organisation